- THE PROJECT
- Water management intervention projects MADRID CITY COUNCIL
- LOCATION
- Madrid
FRAMEWORK AGREEMENT FOR THE PREPARATION OF PROJECTS FOR ACTIONS ASSOCIATED WITH THE AREAS OF RESPONSIBILITY OF THE WATER AUTHORITY
Promoter:
Madrid City Council
Synopsis:
The purpose of the contract was the preparation of projects and pre-projects arising within the Directorate-General for the Management of Water and Green Zones of the Environmental and Mobility Department of Madrid City Council.
The works carried out consisted of defining the drainage, sewerage and water treatment works, including measures in the area close to the Manzanares River:
- Projects for the construction, restoration or improvement of water treatment plants.
- Projects for the construction, restoration or improvement of sewerage networks and associated drainage facilities.
- Projects to adapt and improve the environmental or leisure conditions associated with the Manzanares River.
Among the projects prepared by LKS KREAN, the following deserve a mention:
PROJECT |
DESCRIPTION |
AMOUNT, MEB (€) |
EXECUTION PERIOD |
Improvement of paths and embankments of the Manzanares River |
1,530 m cycle path, 1,530 m pedestrian path, 65 m breakwater wall |
631,353.27 |
4 months |
Consolidation of the land in the area of the primary catch-basins of the Butarque treatment plant. |
No. of micropiles to be executed: 220 units |
2,083,441.59 |
8 months |
Manifold in calle Eduardo Barreiros |
1,400 m of manifold:
|
1,598,820.84 |
12 months |
Vicálvaro A manifold |
3,600 m of manifold:
|
19,018,552.81 |
18 months |
López de Hoyos doubled manifold |
340m of visitable gallery of 1.80 (h) x 1.40 (w) m section, executed via manual excavation in a mine at a depth of between 6 and 10m |
564,572.30 |
9 months |