Water management intervention projects MADRID CITY COUNCIL

THE PROJECT
Water management intervention projects MADRID CITY COUNCIL
LOCATION
Madrid

FRAMEWORK AGREEMENT FOR THE PREPARATION OF PROJECTS FOR ACTIONS ASSOCIATED WITH THE AREAS OF RESPONSIBILITY OF THE WATER AUTHORITY

Promoter:

Madrid City Council

Synopsis:

The purpose of the contract was the preparation of projects and pre-projects arising within the Directorate-General for the Management of   Water and Green Zones of the Environmental and Mobility Department of Madrid City Council.

The works carried out consisted of defining the drainage, sewerage and water treatment works, including measures in the area close to the Manzanares River:

  • Projects for the construction, restoration or improvement of water treatment plants.
  • Projects for the construction, restoration or improvement of sewerage networks and associated drainage facilities.
  • Projects to adapt and improve the environmental or leisure conditions associated with the Manzanares River.

Among the projects prepared by LKS KREAN, the following deserve a mention:

PROJECT

DESCRIPTION

AMOUNT, MEB (€)

EXECUTION PERIOD

Improvement of paths and embankments of the Manzanares River

1,530 m cycle path, 1,530 m pedestrian path, 65 m breakwater wall

631,353.27

4 months

Consolidation of the land in the area of the primary catch-basins of the Butarque treatment plant.

No. of micropiles to be executed: 220 units
Diameter of the micropiles: 225 mm
Foundation slab area: 907 m2
M manifolds HA DN 1000 mm: 167.60m
M manifolds HA DN 1800 mm: 141.15m
No. of manholes: 4 units
Length of breakwater wall: 190m

2,083,441.59

8 months

Manifold in calle Eduardo Barreiros

1,400 m of manifold:

  • M manifold PVC DN 400 mm: 388m
  • M manifold PVC DN 630 mm: 25m
  • M manifold PVC DN 1000 mm: 110m
  • 1,019 m of visitable gallery of section 1.80 (h) x 1.00 (w) m, executed via manual excavation in mine at a depth of between 4 and 9m

1,598,820.84

12 months

Vicálvaro A manifold

3,600 m of manifold:

  • M manifold HA DN 1000 mm: 50m
  • M manifold HA DN 1200 mm: 222m
  • M manifold HA DN 1400 mm: 196m
  • M manifold HA DN 1600 mm: 494m
  • M manifold HA DN 2000 mm: 13m
  • M manifold HA DN 2500 mm: 378m
  • M manifold HA DN 3000 mm: 627m
  • M prefabricated frame HA 3x3 m: 1,397m
  • M prefabricated frame HA 4.5x2 m: 50m
  • M piles under line 9 of Madrid Metro, 2DN 2500 mm: 90m

19,018,552.81

18 months

López de Hoyos doubled manifold

340m of visitable gallery of 1.80 (h) x 1.40 (w) m section, executed via manual excavation in a mine at a depth of between 6 and 10m

564,572.30

9 months